08 January 2008

RHIC Startup:  Instabilities on the ramps required beam intensities in both Blue and Yellow to be reduced throughout the night until finally a good store was achieved at ~9:00PM last night.  Then at 4:00AM a store went up with moderately good beam intensities and great luminosity. 

STAR needs a 30 minute access to replace a VME power supply.  PHENIX will make use of the access to install a converter.  This will occur at the end of the morning store at 10:00AM.


Scheduling Physicist: Mike Sivertz Last updated: 01/08/2008 14:38:01